LArg Front-end Links Meeting
13th January 1999, 0900
Salle Bohr
Marie-Laure Andrieux
-
Radiation levels and neutron energy spectra
in ATLAS : consequences for transient errors observed during irradiation
of Gb/s optical links
-
1999 timetable at CERI
Mark Pearce
-
Brief report from Oxford
optical link workshop
-
News from visit from visit
to MUMEC (GaAs Gb/s serialiser)
-
Status of P. Denes CHFET
800 Mb/s serialiser
All
-
Quick status reports :
-
16 channel bit error rate
tester
-
Preparations / plans for
CERI run
-
Testbeam optical link
integration issues
-
Testbeam copper links
-
AOB
M.P.
12/1/99