MONARC plenary meeting 15th November 1999

Testbed WG meeting

Chaired by Lamberto: non-validation issues, eg. planning for 5.2 tests etc..
  • Cristina Vistoli
  • Youhei Morita
  • General Meeting Agenda

  • Introduction 15' Laura Perini/Harvey Newman
  • About Finnish Computing Center 20' Prof. Kari Laasonen
  • Simulation&Analysis status reports from simulation "users":
  • Report from Alex Nazarenko on work going on in Tufts
  • Report from Paolo Capiluppi on work going on in Bologna/Milan
  • Discussion and planning
  • Preparing a proposal for "Phase3" and the final MONARC report Introduction by Laura Perini/Harvey Newman and discussion
  • Date of Next Meeting and AOB
  • Action Items

  • Lamberto: to complement by end of the week Cristina's slides with a schedule for testbed activities till about Xmas.
  • Everybody: to look at the Draft MONARC note about Objy 5.1 LAN and WAN tests in http://www.pd.infn.it/~sgaravat/Monarc/monarc-network1.pdf and send comments to the testbed list by the end of the week. If no comment requires major corrections the note shall be posted on the MONARC web as MONARC note after the modification possibly required are implemented, in next week.
  • Luciano: to prepare by the 23rd a final "text" version of the RC document.
  • Laura: to prepare by end November a draft of "Phase3 LOI"; unless someone else would like to volunteer before the end of the week...
  • Harvey: to circulate the date and time he is proposing for the meeting before Xmas (the time from 17 is most probably not enough, and as much as possible "in person" discussion would be useful; Harvey has mentioned friday-saturday 10-11/12 when he will be at CERN. Could Krys and Irwin say if they will be in US at such time?)
  • Everybody: Contact each experiment and get their best estimates (both with the present consolidated code and the estimation for "final" code ) of the time (Specint95*time) required for processing an event with:
  • Reconstruction
  • Full Simulation
  • Analysis stages
  • Indication about RAW, ESD, AOD, TAG sizes should also be collected if possible.

  • 23rd November 1999