Chaired by Lamberto: non-validation issues, eg. planning for 5.2 tests etc..
General Meeting Agenda
Action Items
Lamberto: to complement by end of the week Cristina's slides with a
schedule for testbed activities till about Xmas.
Everybody: to look at the Draft MONARC note about Objy 5.1 LAN and WAN
tests in http://www.pd.infn.it/~sgaravat/Monarc/monarc-network1.pdf
and send comments to the testbed list by the end of the week. If no
comment requires major corrections the note shall be posted on the MONARC
web as MONARC note after the modification possibly required are
implemented, in next week.
Luciano: to prepare by the 23rd a final "text" version of the RC
document.
Laura: to prepare by end November a draft of "Phase3 LOI"; unless
someone else would like to volunteer before the end of the week...
Harvey: to circulate the date and time he is proposing for the
meeting before Xmas (the time from 17 is most probably not enough, and as
much as possible "in person" discussion would be useful; Harvey has
mentioned friday-saturday 10-11/12 when he will be at CERN. Could Krys and
Irwin say if they will be in US at such time?)
Everybody: Contact each experiment and get their best estimates (both with the
present consolidated code and the estimation for "final" code ) of the
time (Specint95*time) required for processing an event with:
Reconstruction
Full Simulation
Analysis stages
Indication about RAW, ESD, AOD, TAG sizes should also be
collected if possible.