------------------------------------------------------ Testbeam Schedule 97 ------------------------------------------------------ May at SPS, X5A from Thu 8 May at 9h to Tue 13 May at 9h DBDS-39 strip tracker on SCT128A, strips on growth DBDS-67 strip tracker on SCT128A, strips on growth X-pixel on VA2, 0degree, 90 degree turned F-Pixel (lapped on growth side, cut to 5x5mm2), glass fanout to SCT128) DBDS-47 strip tracker on VA2, candidate for Proton irradiation in June Dot samples June/July at PSI from 30 Jun at to 11 July 1. Approaching Pixel Electronics with Horrisberger Chip work on VME readout 2. DBDS-73 tracker on VA2 July at PS, T10 from Mon 21 Jul at 9h to Thu 24 Jul at 14h DBDS-39 with SCT32A electronics, diode behind DBDS-73 with VA2 with diode behind DBDS-85 with VA2 DBDS-47 with VA2 after irradiation with 3E15protons/cm2 August at SPS, X5A from Wed 20 Aug at 9h to Mon 25 Aug at 9h (5d+0h) DBDS-85 on SCT32A DBDS-39 on SCT32A DBDS-67 on VA2 DBDS-71 on VA2 September at PS, T7 from Mon 15 Sep at 9h to Mon 22 Sep at 6h DBDS-72 strip/dot pattern on VA2 DBDS-72 on SCT32A DBDS-67 on VA2 (unchanged compared to August) DBDS-85 on SCT32A (unchanged compared to August) October at SPS, X5A from Wed 15 Oct at 16h to Wed 22 Oct at 9h (6d+17h) DBDS-39 proposal: 1x1 with variable strip width D = 675 micron (OSU thickness) status: 970909, Wojtek makes mask 971005, OSU redoes metallization 971016, in testbeam X5 DBDS-72 proposal: SCT32 with strip-dot mask and pitch adapter status: 970920, D~1445 micron 971010, two 100-200-50 micron pitch adapters 971015, in beam X5 DBDS-83 proposal: VA2 with strip-dot mask status: 970913 OSU, D~ 690 micron, 971016 in beam X5 small crack 971102 CERN, getting ready for pion-irr. 2x4 proposal: two VA2s/2x4 mask with dot status: 970917 Harris received board from Wojtek 970924 CDS-44 metallized 971016 in beam X5, one VA2 long strips one VA2 short strips Standard Silicon Stripper (Scube): status: 971021 in beam X5 Neutron Irradiation, ISIS, 12.Nov to 18.Dec. 1997 ------------------------------------------------- samples: DB43-P3,P4 U6, U7 DB81-P1,P2,P3 (=CD36-P1,P2,P3) one tracker (e.g. DBDS-72, or DBDS-83) status: DB43-P3,P4 ready at CERN U6,U7 ready at CERN DBDS-72 under test DB81: 970729, DeBeers, D=1202,lapping S:300 G:flat, cutting 971013, OSU for dot metallization 971017, CERN characterization Pion Irradiation, PSI, Nov. 1997 -------------------------------- samples: DB43-P1,P2 U3, U4 DB74-P1,P2,P3 (= CD29-P1,P2,P3) status: 970617 U3,U4, DB43-P1,P2 CERN characterization 971016 U3,U4, DB43-P1,P2 Vienna DB74: 970729, DeBeers, D=1058,lapping S:300 G:flat, cutting Proton Irradiation, CERN/PS/T7, 11.June to 29.June 1997 ------------------------------------------------------- samples: CD12-P1,P2,P3 DBDS-47 (=CDS-17) as a strip tracker (without electronics) status: finished results: final fluence 5E15 p/cm2 ccd const at least to 1E15 analysis in progress