-- RobertoRossin - 2020-03-03

vidyo

New vidyo room:

(old vidyo room: vidyo link PIN 1055)

News:

Some concerns for Covid-19. Everybody works, some from home.

Framework & production

no news

Analysis

B physics

J/Psi going on smoothly. Several email going around. Enrico will send an abstract for IFAE. Enrico: completing the systematics. Deadline for Moriond QCD is march 15.

Heavy New Physics

Yesterday Matteo gave the status report for the Heavy composite neutrino. Going ahead well after beeing stuck with pileup reweighting.

VBS

Next week we are going to make a presentation of the plans. Not really a status report.

WH_SS

SiewYan: not able to preapprove. need to define a our working point. need to get a SF. in the direction of improving the analysis. expect to be done by 2 weeks. Going to Pittsburgh for the talk

Same sign dileptons

no news

EPR

no news

Trigger

no news

Detector

DT

Need to understand what is the time allocated for TP production and BMTF output. Need to check first the content of the TDR.

Timing Layer

Benettoni will stay ith us. The PD contribution has beeen limited to mechanics design, Massimo not happy about that. We discussed w/ the MI group, including Tommaso Tabarelli.

Tracker/tracking

Modules from the TEC arrived in PD last week. They are for the museum. LAst eek we opened the position for tracking validators.

A.O.B.

Egypt 2021. Are we going there?
Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2020-03-03 - RobertoRossin
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    Main All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback