New ZOOM room:

News:

L1 and L2 nominations in the hands of SP and Harrison.

Framework & production

No news.

Analysis

B physics

Martino: received proofs from PLB.

Heavy composite neutrinos

Presented last tuesday. Presentation ok.

VBS

Working on the EFT part of the analysis.

WH_SS

SY: combination result approved last week. Things a coming together for the last chapter which will include the combination results.

H/Z->JPsi gamma

Higgs

Pierluigi: trying to merge the 2 analyses. Unmerged and merged. Not going to Moriond, targeting a PRL. Good results on Z->cc (seems > 5 sigmas).

EPR

PD > 100 % on 2020

Detector

Trigger

No news

Timing Layer

The PCBs arrived to the Lab. Today probes and resistors will be installed. Compact rio will be installed to readout the PT1000. MTD-DPG: Mia has to contact Chiara in Rome to understand the calibrations. Current MTD info are currently used this way: tracks from tracker are propagated to MTD and then the time info back-propagated to the vertex using the hypotheses of pion or proton.

DT

Fabrizio: In Legnaro using the analysis of the thin fiber to understand the pollution of the gas (live it in the flow for a few days, take out and then analyse it). The plan is to have the same at CERN.

Tracker/tracking

Discussing with the MI ppl how to use the vertex reco used in the VDM scans.

A.O.B.

-- RobertoRossin - 2021-03-09

Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2021-03-09 - RobertoRossin
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    Main All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback