vidyo
New vidyo room:
(old vidyo room:
vidyo link PIN 1055)
Action Items:
News:
Framework & production
Big Data: Contacted by CERN people about connector
GRID-SPARC. Trying to run and solving issues. Detailed report maybe next meeting.
Analysis
B physics
Last week Beauty conference. Paolo trying to finalize package for data quality monitoring.
Charged Higgs to top-beauty
AN and paper sent to Higgs conveners, they will let know how to move forward with unblinding.
Dibosons, VZ resonance (V=W,Z)
4B full hadronic
Approval on Wednesday, 15.00:
https://indico.cern.ch/event/728990/contributions/3002606/
Heavy New Physics
VH SM
Same sign dileptons
Finalizing data-drive bkg determination, some instability that is not completely understood, might need to increase systematics, excess less significant.
The topology could be used for WH production measurement. Inclusive already performed by CMS, but could have better sensitivity in WH, H->WW, semileptonic seems very promising.
Could be used to see the excess in control region. Will be able to report in a couple of weeks.
EPR
Trigger(less)
40 MHz readout: assembly of small DT chambers to test the readout, started in Legnaro. Some material still to be delivered, ordered, might arrive in 3 weeks.
One chamber connected, with 2 can already simulate a sector of CMS.
Will have a meeting with GMT people. People want to use the input of GMT, GT to do monitoring, validation of new algorithms, etc. Nee to have a coherent view of the project.
Detector
DT
Luminosity & Bril
Luminosity of 2017 is approved.
Timing Layer
Tracker
A.O.B.: