vidyo

New vidyo room: (old vidyo room: vidyo link PIN 1055)

News:

CMS/CERN restarting. New schedule. no data taking in 2021. Extendend run in 2022 stating from February.

Framework & production

SL7, CC7 discussions on releases. Check the releases here and reply asap. https://docs.google.com/document/d/1yXJn2_6xrnOMmPRcIlhn8yzPiKv7n8P50T3_tlkP1AQ/edit#heading=h.hd9rvsdq5zxu Phys Coord pushes to use UL datasets. CC8: CC7 will be deprecated in 2 years. SL7 is really obsolete and not supported anymore. T2: CC7 already running in there. Some nodes still SL7 for us.

Analysis

B physics

Martino: final reading next tuesday. Last week started the planniing of next step using the "standard" trigger. Should be able to finalize the analysis by the end of the year. Alessio in LIP is still going on wtih p5' analysis, still trigger contact, will continue the collaboration. Martino/Tommaso: plan to use parked datasets is ongoing with Evjin. Report on future meetings. This thursday a talk R(k) and R(J/Psi). ele recostruction at low pt is low, this is the current issue.

Heavy composite neutrinos

not many updates. Working on the systematics. Some validation to check whether everythig is ok

VBS

MI group of the semileptonic will give a talk, we provide the slides.

WH_SS

Dropped the updates about the 2017-18 SF disagreement could be due to wrong datasets

Same sign dileptons

Discussed with Ugo and Alberto. tighten the IP cut to reduce the fake. The DD approach for the fake rate used not simple to use as is defined for a different IP cut, tightening makes more complicated the estimation of the fake.

EPR

eprs covered mainly by: students technicians engineers NEED TO SIGN FOR SERVICE WORK

Trigger

In touch with the TO ppl. Analysis will be easily applied to both the PD and TO setups.

Detector

DT

DT preparing the review foreseen for 25th.

Timing Layer

nothing to report.

Tracker/tracking

this afternoon there will be a meting. will use GPU fr local reco for run3. Mario will give a report on the studies: impact on MET and jet resolution. update of the triplet method in order to estimate the material budget of the tracker.

A.O.B.

Fill the form of access to the department. -- RobertoRossin - 2020-06-16
Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2020-06-16 - RobertoRossin
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    Main All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback