vidyo
New vidyo room:
Action Items:
News:
New indico page created.
Framework & production
Federica: last week we created image of a machine on cloud for Marco's group (big data tools available there now). We can read files from EOS public area, no need to copy the file locally.
Analysis
B physics
Alberto: Found a pb in the B MC. The Bs do not oscillate properly. Still under investigation.
Franco: Luca staarted his thesis. He is now checking the MC samples.
Alessio: P5' analysis: sent the comments to the referees.
Charged Higgs to top-beauty
Jacopo: submitted all the replies to the questions of the preapproval. got follow-up questions. Will reply asap. The MIT is checking the performances of a deep-neural-network wrt the BDT and is performing slightly worse.
Dibosons, VZ resonance (V=W,Z)
Jacopo: final reading of the 2l2q was last week. Went pretty well. Paul did an impressive job in answering all the Q from Bob Brown.
Paul: Lisa's paper has been submitted to JHEP
4B full hadronic
Adres: Preapproves. ARC is reading, we expect some questions
Heavy New Quarks
Will update at the next meeting.
Higgs Dark Matter
Siew: moving away from this. I have a mangerial role now. Moving to the VH analysis we are about to start.
We will add a link to the google doc of the analysis.
Same sign dileptons
Ugo: studying ttW and ttZ, in the new framework. Starting to look om 2017 dataset. Still missing the MC dataset for the same period.
Phase 2 physics studies
Pat: Duccio proposed an activity for the phase 2 tracker upgrade. HSCP is an analysis that will take advantage of the tracker upgrade. The new electronics will have only a threshold (and not 3 bits as before). Need to understand what is the impact of different thresholds on the HSCP analysis.
EPR
Pat: there are EPR for the upgrade. in the POGs and UPSG.
2.5 months EPR recognized for the muon ID studies.
Siew: open to get EPR tasks.
Trigger(less)
Jacopo: Andrea started to reimplement the old electronics in P5. Will check the software w/ the firmware implemented by him. Around easter Andrea will be in Legnaro.
Detector
DT
Roberto: Useful meeting with the DT people.
Luminosity & Bril
Paul: CAlibrations and preparation for the beam. Had the ARC, waiting for a member, then we can go ahead with the approval.
Timing Layer
Tracker
A.O.B.:
Alessio: will have the reharsal of the thesis dissertation.
-- Main.Franco Simonetto 04-10-2017
--
FrancoSimonetto - 2018-03-16