New ZOOM room:

News:

RL procedure: Dario Bisello e' il decano, e' stato contattato e gli si deve inviare la procedura da seguire

Spokeperson nomination : 35 candidates (25 got just 1 vote, the rest got more). By Dec 8th (during the CMS week) the final list should be defined. Starting from Jan 2022 there will be regular meetings for candidates presentations. The election will be in Feb 2022 (PI has 4 votes, the other authors 1 vote).

Search committee next Monday for the Deputy Upgrade Coordinator (Tommaso Boccali successor).

Sector 23 needs to be warm up (issues w/ the beampipe) and this might bring a 1 (or 2) month(s) delay to the start of the Run3, more news at the end of this week.

LS3 schedule (both start and length) will be presented by Fabiola in March 2022.

Framework & production

Analysis

B physics

- tagging framework + angular efficiency task by Sofia group
- Paolo will present the usage of the nanoAOD at the BPH general meeting
this afternoon
- Paolo, Jhovanny and Mia will discuss about the nanoAOD for Run3 at the xPOG on Wed

Heavy composite neutrinos

new version of the AN ready, meeting w/ ARC will be shortly organized

VBS

publication plans ongoing

WH_SS

ntr

H/Z->JPsi gamma

resonance background sample has issue w/ the dilepton mass cuts in the new version of madgraph 2.6.5, so the request will bypass it and x3 statistics will be requested
discrete profiling approach (Rocco's master thesis project) will be presented at the SMP general meeting in 10 days

Higgs

Mu regression

the test on the muons crossing the detector w/ larger angle shows a slight degradation of the performance, which might be cured by a dedicated training (more stat is needed)

Open data analysis

publication w/ Run1 opendata can be "easily" done, since CMS is not interested in having a new cross section paper w/ the same dataset

Detector

Trigger

ntr

Timing Layer

we will meet Edoardo and prof. Mancini on Friday about the new precise thermal measurement
Roberto and Massimo tested the new cooling plates and the thermal paste, and the thermal camera test will be made in order to check the thermal contact
the TEC analysis is restarting after the calibration campaign of the PT1000
the electronic setup will be checked w/ Roberto on Thursday early morning

DT

the new MUON RA needs to be identified and the choice will be made in the next weeks
about longevity: detector note (by Ignacio) w/ the results of the longevity studies.

Tracker/tracking

D* analysis done by DESY group shows nice resonance using the test beam data wink
it is already 11:05 and other news will be described next week...

A.O.B.

-- MiaTosi - 2021-11-09

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r2 - 2021-11-09 - MiaTosi
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    Main All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback