New ZOOM room:
News:
Veneto is not in quarantine anymore.
All simil-fellow starting in july will be compelled to do shifts.
Framework & production
Federica: no news. End of march will stop LSF and migrate to condor.
Enrico: used condor, smooth operation.
Analysis
B physics
The answer to the referees sent for the Bs->Jpsi phi
Heavy composite neutrinos
Pat: neverending unblinding.
VBS
Matteo will present this afternoon on the Z.
Pat: room for theses both for master and
PhD theses
WH_SS
SY: Answering the Q fromHiggs conveners about the approval. spotted errors on the unc. calculation. Higgs combine code under review.
Ugo: reviewers: roberto salerno and vitaliano ciulli will review SY tthesis, end of March will receive it.
H/Z->JPsi gamma
No news
EPR
- 92% in 2020. Please try to look for at least shifts if you are not involved in EPR work.
Central DAQ shifts and DT online/DT DOC available in the second part of the year during CRUZET (July) and
CRAFT (August): those periods will be training for Run3 data takin. Please contact Andrea Gozzelino (INFN LNL), if interested.
Detector
Trigger
Sandro: Jacopo&Co. planning to show the results from Legnaro data taking, probably next week at the DT algo meeting. New progresses in primitive building. Luigi has been informed.
Timing Layer
Isocrate: move the fridge and the crate to the lab. commissioning of the system. TEC will be delivered.
The IB approved the TEC to be part of the project. Asked money to INFN, USA and Portugal. Plan to make the orders for 5/6 now. Korea might join, but it will take time.
Sandro: the
MoU is not written yet.
Ugo: will have to discuss the long term organization of the lab.
DT
Fabrizio : LNL note on ageing work on DT is in construction. Find a working copy here:
http://www.lnl.infn.it/~agozzeli/Internal_Report_LNL/Internal_Report_261_2021_v1.docx
Call for the new Mu system manager. Mary Cruz can be renewed.
Sandro: in the history of Mu the deputy was always promoted, but Darin is not showing signs of proposing for the position.
Tracker/tracking
Next tracker upgrade coordinator will be Andrea Venturi.
A.O.B.
--
RobertoRossin - 2021-02-23