vidyo
New vidyo room:
(old vidyo room:
vidyo link PIN 1055)
News:
CMS still running on minimal crew (30ppl/week)
Travel (mission) in principle allowed, directors not so keen to sign the permission.
Framework & production
TODAY: switching from the old storage system (lustre) to the new nfs.
Check if there are jobs running in queues.
delete old VM. change the mountpoint as per direction given by Federica.
Analysis
B physics
Alberto: Alberto and Enrico giving talks LHCP, ICHEP.
Long discussion with the ARC on how to address the CWR comments. Paper should go to Final reading by the end the week.
Briefing published with an error, found a mistake, corrected.
Heavy composite neutrinos
Pat: yesterday gave status report at the subgroup. Not a full status, but almost. got suggestions from conveners (use combined fit).
VBS
Things are more relax. The student in Paris is now back at work. the framework is very well validated. The pressure is released, not approving for ICHEP anymore, this is good for us.
WH_SS
SY: combination: sorting out the bin optimization and the checks on negative weights.
electron scale factors. gave update last week, still some discrepancy btw mini/nano AOD.
Thesis: converging on WH_SS analysis. Try to understand what will make into the thesis.
Same sign dileptons
no news.
EPR
SY: received a request for EPR from a gen convener. Time commitment moderate.
Alberto: sample for validating B-physics went lost in the last campaign. There is a co-validator (Mastrapasqua) who is actually working.
Trigger
Lorenzo is in Legnaro. Supposed to organize a meeting to draw a plan for the restarting of the activities.
Detector
DT
no news on the aging. still waiting to know to start.
Timing Layer
Good news: money will be available in time to open the position in end of july. The student working with us started to work, followed by Massimo.
today there is a discussion on the mechanics and thermal measurements.
Tracker/tracking
Work on the TEC petal for the exibition.
A.O.B.
--
RobertoRossin - 2020-05-26