Cryogenic Current Monitor Project @ CERN
AD CCC implementation
The CCC is installed in Sector 2A between the quadrupoles QDS15(v) and QFN16(h). Integrated in these magnets are the BPM's UVT1500 and UHZ1602 respectively.
Open Issues
- Acquisition with scope of AD cycle. how to step acquisition window to 80s? Can only set it to 50s or 100s.
- Find optimal SQUID settings
- Prepare cables:
- 2pin-lemo to 2pin-lemo
- 2pin-lemo to BNC or 00-lemo
- Acquire pressure signal directly from sensor and not through PLC (results in reduced resolution)
- Descrepancy between readings of PT100 temperatures are wider than they should be
- Redo PLC hardware setup and wiring
- Check/update connection table
- Install PLC in NIM crate
- Decide if to use breakout cables
- Change acquisition SW
- Change patch panels for CCC signals
- Fix and make better connection box and respective filter for calibration signal
- Prepare insulation amplifiers
- MD measurements
- AD injection jump: trigger kicker without beam or any other system active
- AD injection jump: have an injection with smaller number of antiprotons
Design
FrequencyResponse
MagniconSQUID
KeithleyCurrentSource
OtherData
AD Installation
EquipmentIdentificationCodes
AcquisitionControls
Signal processing
- Convolutional networks ??
1st CERN CCC iteration
2nd CERN CCC iteration (2016)
ConnectionTests2016
FirstLabMeasurements2016
TroubleshootingTests
Set ALLOWWEBVIEW = < bi-cryogenic-current-comparator >
--
MiguelFernandes - 2016-03-07