check for the coffe breaks at bat 40 mad lunch into 222
TDR
propose a structure revision - move the prototype and test under design and verification, or have in the design. For each item a verification paragraph.
correct the Safety
correct acceptance
lesson learned change in to be revised
Magda
DVD
Safety
INFRA
Risk Register
Telescope Diagram
Camera
verify Krzysztof order status - DONE every part is ready, PCB ready by next week
verify status of payment to TFP, VO, BTE, - TFP to pay 1000 cones, VO 150 payed , BTE to check
order cables for camera 144 pixels (check length with Franck/Michal) - ASKED
check mechanics status
chassis with Michal
LID arrange a phone call with IFAE I'm August
Cooling with Michal
Cones
Cone measurement results,
automated set-up, schedule and plans - Part ready waiting for Juanan
12 pixels module
test set-up status - all software and board ready , waiting for Franck Mechanics (source and holder)
gluing -> how many modules ready? (Coralie) - Coralie on Holiday until 25/8
electronics status ( slow control, pre-amp ' tuning for LCT2)