Official page

Monday session

Update of KEK/HPK status

  • Slide4: increadibly stable current and small (O(100nA)/FEI4 area), up to 1000V: GR contacted?
  • Slide6: Efficiency from beam test
  • Slide7: Charge collection efficiency: normalized to the value at 1000V
  • Slide8: "Mafalda plot": vertical error bars!!! -> See John's talk tomorrow
  • Slide17: 700 MeV-p at RNCP in Osaka: it needs to be investigated
  • Slide19: Pseudo-4 chips & Real-4 chips

Results with n-in-p pixel sensors irradiated up to a fluence of 1e16 neq/cm2 and future productions at CiS

  • Slide10: FEI4 chips
  • Slide11: Waiting for the active edge modules produced at VTT (100 and 200 um thickness): delay in the production due to problems of the DRIE machine.

IBL production status

  • Slide1: same talk will be given at IBL meeting
  • Slide3: Depletion voltage measured on pad diodes
  • Slide4: 3 pad-diodes on the same wafer
  • Slide7: acceptance criteria
  • Slide8: book-keeping
  • Questions: SIMS measurements? Good VS Bad

  • Luciano's comment: Anna parla di maschera uniforme per rimuovere il coating di allumina, come se si forse una cosa ovvia, ma in realtą la maschera deve essere sui bordi deichip, il che non č certo un processo standard e non si presta a essere eseguito sulle macchine di processo standard. Richiederą un bricoalge manuale....

Daniel's comments on SCP

  • Join them
  • Cleaved better than before cleaving
  • Right now the 'thing' is US-based (Navy!): let's see if we can do this EU-based
  • Easy for n-bulk: SiO2. Harder for p-type: ALD of Alumina
  • Anna's comment: not proven technology

Brief look at IBL planar module status, bump-bonding possibilities for "non-IBL" R&D at IZM, FE-I4B adapter cards, FE-I4B wafer order

  • Slide9: FEI4B: 16 wafers received early December
    • Testing started on Dec 15
    • 3 FE-I4B irradiated in Los Alamos
  • Slide 10: No flip chip to non IBL sensors will happen in the next 6-8 months

Discussion on irradiation plans for 2012, sample shipments, wirebonding sites, ...

  • Los Alamos (only 2nd half of 2012, application due in March)

-- MarcoBomben - 13-Feb-2012

Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r3 - 2012-02-13 - MarcoBomben
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    Main All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback