LHC Startup
Runs
RUN |
Events |
Start |
Stop |
Beam |
Beam note |
BPTX |
BSC |
EG5 |
Trigger Note |
Note |
122023 |
42763841 |
2009.11.21 11:55:56 |
2009.11.21 11:55:45 |
No |
|
|
|
|
|
|
122011 |
3290085 |
2009.11.21 11:19:39 |
2009.11.21 11:44:27 |
|
|
|
|
|
|
122004 |
1622986 |
2009.11.21 10:54:21 |
2009.11.21 11:14:39 |
|
|
|
|
|
|
121999 |
155 |
2009.11.21 08:38:01 |
2009.11.21 09:37:02 |
|
|
|
|
|
|
121998 |
3 |
2009.11.21 07:50:20 |
2009.11.21 08:30:27 |
|
|
|
|
|
|
121997 |
96 |
2009.11.21 06:58:02 |
2009.11.21 07:40:13 |
|
|
|
|
|
|
121995 |
220 |
2009.11.21 05:26:01 |
2009.11.21 06:46:42 |
|
|
|
|
|
|
121993 |
279 |
2009.11.21 03:52:51 |
2009.11.21 05:07:02 |
B1 |
Splashes |
miss |
|
X |
|
|
121982 |
1 |
2009.11.21 01:50:16 |
2009.11.21 02:09:54 |
B2 |
Splashes |
X |
|
|
1 splash |
All events to the ErrorStream |
121981 |
4 |
2009.11.21 01:44:13 |
2009.11.21 01:47:52 |
X |
|
|
4 splashes |
121980 |
18 |
2009.11.21 01:20:33 |
2009.11.21 01:35:29 |
X |
|
|
GCT Out, EG5 timed in at 51 for the SLBs |
121976 |
27 |
2009.11.21 00:46:34 |
2009.11.21 01:11:37 |
Capture |
X |
|
|
121964 |
180679 |
2009.11.20 21:31:32 |
2009.11.20 23:35:17 |
B2 |
Splash+Circ.+Capt. |
X |
X |
|
BSC added after splashes and timed on the BPTX |
~25000 turns at most |
121962 |
89305 |
2009.11.20 20:45:02 |
2009.11.20 21:13:38 |
B1 |
Capture |
X |
X |
X |
|
Interrupted by trg when trying to apply the HTL prescale. BGO Stop sent. DCCs Stopped. |
121960 |
2132 |
2009.11.20 20:16:42 |
2009.11.20 20:40:50 |
Circulating |
X |
X |
X |
|
|
121949 |
1030 |
2009.11.20 19:15:13 |
2009.11.20 20:15:31 |
Fast track |
X |
X |
X |
Only 2 EG, Flooded by BSC |
|
121943 |
466 |
2009.11.20 17:21:42 |
2009.11.20 19:13:58 |
X |
X |
X |
|
121942 |
4488 |
2009.11.20 16:54:54 |
2009.11.20 17:14:54 |
X |
X |
X |
|
Friday
Saturday
Week 47
Friday
- Super-stable until Monday
- No collisions before end of the next week. 2 weeks estimated since circulating beam but lot of pressure to reach them earlier
- Stability lock released on monday
- It will be enforced again before the collisions
Report
- Database Redundancy to be tested in the future
- RCT Automatic Masking from FED vector
-
Daily planning
- DCC fw rollback
Week 34
- Magnet ramps down at 7.30 Tuesday morning, up at 11.00 Friday morning.
Notes
- Wolfgang on holidays from Thursday on for 10 days.
- Ken back on Monday
- Sasha Singovski as replacement for 3 days
- Mask CCU 32 in EE-5
Week 33
Monday
- Call Pascal in the moning to figure out whether is realistic to test the EE+ trigger on Thurdays. If that is the case, check with Adi whether to take out of the global EE+ for 4/5 hours to hand it to Sasha for the HV scan.
- SOAK light TOrbit Gap: starts at 3480, ends at 3564. The trigger gap ends at 3563 and lasts 35 bx backwards. Check where the SOAK light goes with the pfg, check what the EMTC people can do about the soak light triggers The trigger can extend the gap backwards for CRAFT if required. (expected between 3485-3495, two months ago )
- DONE
- ZS threshold in EE+ changed
Wednesday
- HV scan, Wednesday starting between 8 am and 2pm.
- Run stopped, EE+ out, laser out
- EE(+/-) ramped down. HV settings changed, EE+/- ramped up.
- EE- in again
- EE+ to Sasha in the afternoon, out until next morning.
- Sergey and Diogo alerted
- Soak light
- Trigger Masking
- Software masking
Thursday playtime
Requests:
- Pascal: EB trigger timing problem (1-2hrs), here are 2 board in EE- that are unplugged because the compact flash is corrupted (1hr), status of EE+ trigger (2hrs with GT-GCT-RCT). Total:~4-5hrs, out of which 2hr using RCT+GCT+GT.
- ES: 1hr(LTC)+1hr(GCT)+1hr(firmware) = 3hrs
- Jose': 2/3 hrs to debug the FOB problem
-
- EE+ Trigger + SRP decisions [avra' bisogno di tutto EE+]
- ES DCC firmware update tests
- DCC weights with EB+/EB-
- ES PVSS updates
- ES DCC monitoring software updates
Friday
- Friday Run Meeting
- Data Quality Report, 20 minutes including the question time
Week 32
- Led soak light (switched on by Sahsa w/o warning)at 1 kHz. It's not correctly timed in and it leaked into the physics events. -> RUN BAD
- EB-5 , -6 noisy, the 2 EB- SMs affected by the TRK noise. -> Not a big deal. The DCC switches to the ZS and the ForceSuppression, FIFO Full flags are set. Nel DQM si vedono 5-100 eventi per RUN su due torri singoli. Su 40 Milioni
- Saturday: Sistemati Ped Offsets. Pedestal Offset Scan.
- Sasha HV scan: Ha bisogno di tutto EE+ [Togliere il laser dalla calib sequence: Cosmics-SR-No-Laser].
- Readout: Tutte le DCC vanno bene in Global (non sempre il local). 2 casi di wrong event number, non si sa se sia un problema di dcc o myrinet. 3 DCC (EE+5,+6,+7) hanno mandato l'evento sbagliato, nello stesso crate. EE-1 venerdi' ha mandato l'evento sbagliato. (Sync Lost Draining DAQ status)
- Cambiare la soglia del selective readout EE+ a 15 Lun Mattina. (soglia 1, la 2 non e' usata).
--
AlessandroThea - 18-Nov-2009