CERN PS Booster Upgrade Working Group

The LHC Injectors Upgrade (LIU) should plan for delivering reliably to the LHC the beams required for reaching the goals of the high luminosity LHC (HL-LHC). This includes LINAC4, the PS Booster, the PS, the SPS, as well as the heavy ion chain.

Within the LIU project the PS Booster upgrade project (“LIU-PSB”) coordinates all activities related to an upgrade of the PS Booster in order to deliver ultimate LHC beams. This had included the study of two scenarios to replace the PS Booster by a new PS injector : PSB Energy Upgrade and Rapid Cycling Synchroton (RCS). In August 2011, it was decided not to go further in the RCS study (a link to the study remain here), and to go for the PSB Energy Upgrade.



Mandate: Study of an Energy Upgrade of the CERN PS Booster

Study leader: K. Hanke, BE/OP

The aim of the study is to evaluate the technical feasibility of an increase in beam energy of the CERN PS Booster from presently 1.4 GeV to about 2 GeV as proposed at the Chamonix 2010 workshop.

The study comprises:

  • Confirm the potential gain in terms of intensity and brilliance for LHC-type beams as presented at the Chamonix 2010 workshop.

  • Confirm the technical feasibility. Identify accelerator components and equipment that need to be upgraded or exchanged. Identify potential showstoppers and point out solutions. Assign the responsible groups/units. Provide first rough time estimates for the various interventions needed.

  • Provide a first estimate of material and personnel resources needed to complete the upgrade. Draft a project break-down into work packages, in preparation for a project to be launched by the director of accelerators.

Project Break-down

  CERN Coordinator K. Hanke  
  CERN Deputy Leader B. Mikulec  
  Scientific Secretary V. Raginel  
  US LARP Representative E. Prebys  

  Work-Package Responsible Unit
2. Beam Dynamics C. Carli BE/ABP
3. Magnets D. Tommasini, A. Newborough TE/MCS
4. RF Systems A. Findlay, M. Paoluzzi, M.E. Angoletta, A. Blas, A. Butterworth BE/RF
5. Power Converters S. Pittet, D. Nisbet TE/EPC
6. Instrumentation J. Tan BE/BI
7. Beam Intercepting Devices O. Aberle, A. Massi EN/STI
8. Vacuum System J. Hansen TE/VSC
9. L4-PSB Transfer and PSB Injection W. Weterings, C. Carli TE/ABT, BE/ABP
10. PSB Extraction and PSB-PS Transfer J. Borburgh, W.Bartmann TE/ABT
11. Controls S. Jensen BE/CO
12. Electrical Systems D. Bozzini, S. Olek EN/EL
13. Cooling and Ventilation M. Nonis EN/CV
14. Installation, Transport and Handling I. Ruehl, C. Bertone EN/HE
15. Civil Engineering L.A. Lopez-Hernandez GS/SE
16. Radiation Protection J. Vollaire DGS/RP
17. Interlock Systems B. Puccio, P. Dahlen, B. Todd TE/MPE
18. Alarms   --/---
19. Access Systems - Doors   --/---
20. Survey T. Dobers BE/ABP
21. Commissioning and Operation B. Mikulec BE/OP
22. Dismantling   --/---

    Linkpersons Unit
  Safety N. Gilbert EN/MEF
  Design Office S. Mathot EN/MME
  Integration Y. Muttoni EN/MEF
  Optics Database   --/---
  Layout Database S. Bartolome, P. Le Roux EN/MEF, BE/CO
  Technical Coordination P. Bonnal DG/DI
  HSE Correspondant A. Jorge Henriques DGS/SEE
  Consolidation and Shut-Down Work N. Gilbert EN/MEF
  PS S. Gilardoni, R. Steerenberg BE/ABP, BE/OP

Main Web Utilities

-- PiotrB - 27-Jan-2012

Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2012-01-27 - PiotrB
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    Main All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback