Dear colleagues, this directory should help you to find the contributions of the Jan/Feb 2000 SCT week. Please tell me about mistakes ! best regards, Hans-Guenther Moser http://documents.cern.ch/cgi-bin/setlink?base=other&categ=ext&id=sctfeb00 files: SCTFEB00-A SCT Systemtest/Beamtest/DAQ Working Meeting =========================================== 1 Agenda 2 Systemtest Status Report (J. Pater) 11 Proposed changes to power tapes, doglegs (J. Troska) 13 DAQ and analysis software for SCT module tests using CLOAC/MuSTARD/SLOG readout (P.W. Phillips) 18 Summary of noise measurements in the system test (S. Gadomski) 29 New SCTLV Design (J. Stastny) SCTFEB00-B 1 ATLAS Trigger/DAQ Workshop (J. Hill) SCTFEB00-C 1 Testbeam Agenda 2 Test of GEANT4 (F. Gianotti) 5 September results (preliminary) (M. Vos) 22 KEK testbeam (G. Moorhead) 33 Outstanding Issues (G. Moorhead) 36 Test Beam Schedule (G. Moorhead) 40 PS Irradiation program 2000 (C. Buttar) SCTFEB00-D Detector Working Group Meeting ============================== 1 Detector Working Session (Agenda) 3 RD48 Oxygen-enriched detector measurements (M. Moll) 28 Measurements of oxygenated and thin W12 CIS detectors (L. Andrizek) 39 Measurements of oxygenated Micron detectors (G. Casse) SCTFEB00-E 1 More measurements of oxygenated Micron detectors and diodes (D. Robinson) 11 First measurements of oxygenated Sintef B1 detectors (L. Johanson) 17 Detector current evolving during irradiation (R. Harper) 26 Detector production database SCTFEB00-F 1 Barcode for production database (N. Unno) 10 Status of UK-B Preparation for Pre-Series Detector testing 16 Recent Results of the Forward Detector Strip Scans (A. Chilingarov) SCTFEB00-G 1 con't 6 Prototype detector testing at Sheffield (C. Buttar) SCTFEB00-H Electronics Session =================== 1 KEK Testbeam analysis SCTFEB00-J 1 KEK Testbeam Analysis (Z. Dolezal) 6 Kapton 3 Info (Z. Dolezal) 8 Results from irradiated forward module (L. Feld) 21 Forward Freiberg Hybrid at Geneva (B. Dick, D. Macina) 23 Barrel Module with ABCD2T chips on Thin Film hybrids with Copper Ground Plane (P.W. Phillips) 32 PS Irradiated CAFE/ABC Hybrid (T. Dubbs, N. Spencer) SCTFEB00-K 1 ABC-CAFE Irradiations with neutrons (I. Mandic) 16 ABCD2T Irradiations with neutrons (I. Mandic) 29 ABCD Timing Measurements (J. Kaplon) SCTFEB00-L 1 ABCD Timing Measurements (T. Dubbs) 4 Module with irradiated ABCD2T chips (B. Dick, D. Macina) 31 ABCD2T Digital Functionality (F. Anghinolfi) SCTFEB00-M 1 Specification Issues (W. Dabrowski) 23 Electronic Session II Agenda 24 Optoflex and Low Mass Tapes (A. Weidberg) SCTFEB00-N 1 SCT and Pixel OFF Detector Electronics (R. Jared) SCTFEB00-O Forward Module Meeting ====================== 1 Forward Module Meeting: Agenda 2 System TEST Program (J. Ludwig) 3 Module Design Update (P. Sutcliffe) 6 Resources for System Tests (J. Ludwig) 7 Glue Properties (H.-G. Moser) Barrel Module Meeting ===================== 12 Agenda of barrel module session 13 Reverse assembly sequence test (J. Greenhalgh) SCTFEB00-P 1 Baseboard desing/simulation (G. Morin) 3 Why and how to mount retroreflectors on the SCT barrel modules (M. Tyndel) 7 Handling Box for the SCT Barrel Modules (S. Terada) 11 Shielding layer in the cooling facing (Y. Unno) 13 Module Barcode (Y. Unno) 15 Testing of ASIC replacement on the Barrel Kapton hybrid (Y. Unno) 16 Module Programmes (Y. Unno) 21 SCT Baseboard Production (A. Carter) 26 Comments and news on modules assembly (R. Apsimon) SCTFEB00-Q Module Meeting (Barrel/Forward) =============================== 1 Module Meeting (Common): Agenda 2 Summary of Barrel Meeting (Y. Unno) 16 Comments on Module Survey (S. Terada) 21 Module Assembly Accuracy -State of the Art - (L. Feld) 27 Alignment Specifications (S. Snow) 37 Database - Bar code reader - (J. Foster) 38 Production tests of Modules (S. Gadomski) 46 Electrical Tests of Modules (G. Moorhead) SCTFEB2-1 Engineering Meeting =================== 1 Engineering meeting: agenda 2 Barrel support structures (E. Perrin) SCTFEB2-2 1 End-cap disks and support cylinder (D. Greenfield) SCTFEB2-3 1 Cooling -overview- (G. Hallewell) SCTFEB2-4 1 Cooling con't 6 Services -overview- (M. Mikuz) SCTFEB2-5 1 Assembly -overview- (R. Nickerson) SCTFEB2-6 1 Final assembly scenarios (R. Nickerson) 10 Surface building (G. Tappern) 16 M&O budget (M. Turala) SCTFEB2-7 Plenary ======= 1 Plenary: Agenda 2 Introduction (M. Tyndel) ? Summary & Plans for the ASIC Program (A. Grillo) 7 Techical co-ordination issues (M. Turala) 19 Forward Module programn (J. Ludwig) 29 Barrel Module program (M. Tyndel)