Dear colleagues, this directory should help you to find the contributions of the Feb 99 SCT week. Please tell me about mistakes ! best regards, Hans-Guenther Moser Directory of scanned transparencies of February 1999 SCT week http://preprints.cern.ch/cgi-bin/setlink?base=other&categ=ext&id=sct-week-feb.1999 sct-9902-a 1) Detector Irradiation Session AGENDA ==================================== 2) Pre-Irradiation Measurements Required for Qualification (D. Robinson) 4) Summary of detector currents during November irradiation and I-V,C-V measurements of detectors annealed together at CERN (D. Morgan) 33) Summary of measurements to-date of CiS implanted and polysilicon detectors (L. Andricek) sct-9902-b 1) Summary of measurements to-date of irradiated CSEM detectors and pre-irradiation measurements of new W32 detectors (D. Ferrere, C. Morone) 19) Summary of measurements to-date of Hamamatsu, Micron 4" and Micron 6" from September and November irradiations (D. Robinson) sct-9902-c 1) Summary of measurements to-date of SINTEF detectors (O. Rohne) 6) Resistance in the front-bias scheme after irradiation at KEK (N. Unno) 7) Infrastructure for module irradiation, plans for 1999 and work for detector PRR (J. Carter) sct-9902-h 1) Agenda for systemtests, H8 and DAQ Session ========================================== sct-9902-c 17) Systemtests: Status and Plans (J. Pater) 29) Systemtest preparations at NIKHEF (F. Hartjes) sct-9902-h 2) SCT Systemtests DAQ (G. Moorhead) 7) H8-1999 (S. Stapnes) 12) DIG and ROD (J. Hill) sct-9902-e.tif 1) Electronics: Front end session: AGENDA ====================================== 2) Status of CAFE-P/ABC (A. Grillo) 4) ABCD Test Results at CERN (D. Marcina) sct-9902-f ABCD Test Results at Liverpool (A. Greenall) 2) ABCD Test Results at KEK (Y. Unno) 25) ABCD Test Results at LBNL (H. Niggli) sct-9902-g 2) ABCD Irradiation Test Results (C. Lacasta, F. Anghinolfi) 28) Summary of understanding of ABCD (F. Anghinolfi) sct-9902-i 1) Agenda Hybrid Session ===================== 2) New Freiburg Forward Kapton Hybrid (??) 6) Update on Kapton ABCD and CAFE-P/ABC hybrids (N. Unno) ?) Thin film hybrids on PG and TPG (A. Carter) 35) Use of mixed silver and gold conductor on BeO (C. Haber) 43) Discussion of technology issues/reviews sct-9902-j 1) Modules Session Agenda ====================== 2) New thermo-distortion measurements of the barrel module (Terada) 10) ESPI Measurements of Thermodistorsion on Irradiated SCT Barrel Module (??) 25) Results from the new UK barrel module (Apsimon) 30) Barrel module geometry definition (N. Unno) 35) SCT specifications: Detector Module (Moser) 40) Production Database (J. Foster) 44) Thermal modules for 1999 (Unno) 46) The -2 and -1 modules for 1999 (Carter) sct-9902-k 1) Forward Module Meeting ====================== 3) Progress on module cooling and cooling block interface (T. Jones) 11) Assembly jig design (P. Modesto) sct-9902-l 1) Jig design status (P. Sutcliffe) 4) Freiburg bonding jig 7) Results on the Forward thermal modules (S. Snow) 15) Cooling and Fixation of Forward Modules (H. Becker) sct-9902-m 1) FEA of single cooling point forward module (H.-G. Moser) 9) Optical survey of silicon detector modules (H.-G. Moser) Optolinks Session ================================== more about this session here: http://www.cern.ch/Atlas/GROUPS/INNER_DETECTOR/sctnew/Electronics/links/minutes/feb99/sctlink18feb99.html 17) BMP Status (R. Wastie) 25) DORIC radiation tests (T. Weidberg) 27) Cavern Fibre Cable (R. Wastie) 31) Dog Leg to Low Mass Tape Connection (T. Weidberg) 33) New Sources for Opto-packages (T. Weidberg) sct-9902-n 1) Module Assembly Session: Agenda =============================== 2) Progress on module assembly at RAL (M. Gibson) 20) Metrology with Smart Scope (W. Murray) sct-9902-o 1) Metrology Results from Manchester (S. Snow) Database for Module-2 (D. Ferrere) see: sct-9902-j page 40 6) KEK precision modules (S. Terada) 14) Forward modules from CERN/Geneva Cluster (D. Ferrere) 25) Update on calibration plate (C. Haber) Discussion on module tooling workshop (C. Haber) sct-9902-p 1) Engineering Session: Agenda =========================== 2) Results from evaporative cooling studies (G. Hallewell) sct-9902-q cont' sct-9902-r 1) Towards the choice of the SCT cooling system (S. Stapnes) 3) End-cap layout (A. Clark) 21) Barrel cylinder: results of prototype (D. Buira-Clark) sct-9902-s 1) Barrel cylinder: further work and longterm plans (E. Perrin) 16) Barrel assembly procedure and equipment (Nickerson, Perrin) sct-9902-t 1) Status of the end-cap/disk construction (H. Schuijlenburg) 18) End-cap disk services and support structure (A. Pilling) 40) Disk thickness (H. Becker) sct-9902-u 1) Thermal calculations for the barrel (B. Hawes, R. Nickerson) 9) Specifications, PBS and EDMS (M. Turala) 23) EDMS & CAIDM (D. Greenfield) 47) SCT Schedule and outstanding issues (G. Tappern) sct-9902-v 1) Readout Electronics =================== 2) L1 Trigger Latency Budget (J. Lane) 16) DCS Requirement Document (R. Brenner) 22) Power Budget Issues (A. Grillo) 29) Discussion of Cable Specifications (P. Malecki, M. Turala) sct-9902-w 1) Plenary Session Agenda ====================== 2) Status Report (M. Tyndel) 12) Beam & System Test (S. Stapnes) 15) SCT Requirements, Specifications, Approval, Documentation (M. Turala) 30) Detector Procurement Proposals (J. Carter) ================================================================ Hans-Guenther Moser Max-Planck-Institut fuer Physik Foehringer Ring 6 80805 Muenchen, Germany Tel: ++49 89 32354-371 Fax: ++49 89 32354-804 E-mail: moser@mppmu.mpg.de ================================================================