Module design/selection Work Plan/Milestones (Revised: 1995/12/3) December Review - Dec. 4, 95 Thermal measurements (RAL, KEK) Thermo-mechanical analsys (RAL) Noise measurement of H8 modules (LBL, UCSC, RAL, Oxford, Cambridge, Liverpool...), Noise measurement of FELIX128 Z modules (Oslo, CERN), Capacitance measurement of fan-out/ins (RAL) Radiatin length: Final modules, H8 modules (LBL, UCSC, RAL, Oxford, Cambridge, Liverpool, Oslo, CERN) Forward module design issues (Forward group...) March/April Review - March/April 96 Thermal measuremnts (runaway with irradiated detectors, etc) (RAL, KEK, Geneve) Thermo-mechanical distortion measurement (Oxford, RAL, KEK) Module preparation (RAL, KEK, Geneve) Measurements (Oxford) Follow-up of the electrical performance (see Dec. review) DSSD modules (Munich, KEK, Oslo,...) Noise of the binary Z- and rphi- modules for the Feb 96 beamtest at KEK (LBL, UCSC, Geneve) Cost, Construction aspects (RAL, LBL, UCSC, KEK, CERN, Geneve, Munich...) Forward module designs and measurements (Forward groups...) June/Jul Review - Jun/Jul 96 Hybrid material (Kapton, Ceramic) (RAL, LBL, UCSC, KEK, Liverpool, Munich,...) Follow-ups of the March review (...) Follow-up of the Forward module measuements Decision on the Barrel baseline module (and backup) September Review - Sep 96 Production assessment of the Barrel baseline module Decision of the Forward baseline module Start of discussion on the 97 TST modules (Barrel and Forward) Nov/Dec Review - Nov/Dec 96 Freezing the module design (Barrel and Forward) Production plan for the 97 TST module (Barrel and Forward)