ATLAS SCT Testbeam(14 - ) 21 - 28 August 2002 beamtest at CERN H8 |
Offline Analysis and Preliminary Results (Valencia group)
Scan log file
Module Calibrations and Characterisations
Photos
The last testbeam for 2002. In this beamtest we concentrate on final measurements of the irradiated modules, including the last two barrels, and the two newly irradiated endcaps. If possible, we will include late irradiated barrel modules with new-epi chips.
Volunteers for shifts, especially new people, would be *extremely* welcome.
People available for shifts (please send me your available dates and times)
Modules should be positioned bearing in mind their order of arrival, and the arrangement for the proposed tracking exercises. The pitch of the slots in the chamber is 45mm. Evolving module table:
Name | Type | Irrad? | From/Contact | When ? | Wafer | C-factor | Comment |
0026 | Barrel | No | Joern/ST | start | Efficiency reference | ||
0097 | Barrel | No | KEK | 16/8 | Unirradiated barrel, new-epi series run, 111 series wafers | ||
0096* | Barrel | Yes | KEK | 26/8 | Z40859-W07 | 1.044 | Irradiated barrel, new-epi series run, 111 series wafers |
Q3* | Barrel | Yes | USA/Felix | 26/8 | Z38850-W20 | 1.154 | Irradiated barrel, new-epi "fast corner run" |
0007* | Barrel | Yes | KEK | start | Irradiated barrel, old-epi | ||
0034* | Barrel | Yes | KEK | start | Irradiated barrel, old-epi | ||
0044* | Barrel | Yes | KEK | start | Irradiated barrel, new-epi "normal corner run" | ||
0047* | Barrel | Yes | KEK | start | Irradiated barrel, new-epi "normal corner run" | ||
k5_308* | Outer F | Yes | FR | 19/8 | Irradiated outer endcap | ||
k5_310* | Outer F | Yes | CERN-Geneva | start | Irradiated outer endcap | ||
k5_312* | Outer F | Yes | CERN-Geneva | start | Irradiated outer endcap | ||
k5_303 | Outer F | No | ST/Jo | start | Unirradiated outer endcap | ||
k5_315 | Outer F | Hybrid only | C/G | 23/8 | Module assembled from unirradiated sensors and an irradiated hybrid. | ||
kb_104 | Outer F | No | C/G Mariane | 19/8 | KB | ||
kb_105 | Outer F | No | C/G Mariane | 19/8 | KB |
Modules to be installed in the following slots, arranged for tracking studies of the irradiated modules. Two warm-up/cool-down cycles are foreseen, one on Friday to install k5_315 as soon as it is available after assembly and testing, and one on Monday to exchange irradiated barrels to the two which finish annealing on Monday morning (0096* and USA-Q3*). We will do basic threshold scans at several bias voltages on all modules, i.e., we repeat these basic scans several times as modules are exchanged.
ID Slot At start: Friday: Monday: 11 -1 kb_104 -> k5_315 0 0 0026 1 1 k5_312* 2 2 0034* 3 3 0097 4 4 0007* 5 5 k5_310* 6 6 0047* -> 0096* 7 7 k5_303 8 8 0044* -> Q3* 9 9 k5_308* 10 10 kb_105