ATLAS SCT Testbeam

(14 - ) 21 - 28 August 2002 beamtest at CERN H8


Offline Analysis and Preliminary Results (Valencia group)


Scan log file

Module Calibrations and Characterisations


Photos

The last testbeam for 2002. In this beamtest we concentrate on final measurements of the irradiated modules, including the last two barrels, and the two newly irradiated endcaps. If possible, we will include late irradiated barrel modules with new-epi chips.

Volunteers for shifts, especially new people, would be *extremely* welcome.

People available for shifts (please send me your available dates and times)

Shifts

Shift Instructions


Schedule   :   14 - 28 August 2002


Modules

10 Slots, plus two end-wall positions, for 12 modules in total.

Modules should be positioned bearing in mind their order of arrival, and the arrangement for the proposed tracking exercises. The pitch of the slots in the chamber is 45mm. Evolving module table:

Name Type Irrad? From/Contact When ? Wafer C-factor Comment
0026 Barrel No Joern/ST start Efficiency reference
0097 Barrel No KEK 16/8 Unirradiated barrel, new-epi series run, 111 series wafers
0096* Barrel Yes KEK 26/8 Z40859-W07 1.044 Irradiated barrel, new-epi series run, 111 series wafers
Q3* Barrel Yes USA/Felix 26/8 Z38850-W20 1.154 Irradiated barrel, new-epi "fast corner run"
0007* Barrel Yes KEK start Irradiated barrel, old-epi
0034* Barrel Yes KEK start Irradiated barrel, old-epi
0044* Barrel Yes KEK start Irradiated barrel, new-epi "normal corner run"
0047* Barrel Yes KEK start Irradiated barrel, new-epi "normal corner run"
k5_308* Outer F Yes FR 19/8 Irradiated outer endcap
k5_310* Outer F Yes CERN-Geneva start Irradiated outer endcap
k5_312* Outer F Yes CERN-Geneva start Irradiated outer endcap
k5_303 Outer F No ST/Jo start Unirradiated outer endcap
k5_315 Outer F Hybrid only C/G 23/8 Module assembled from unirradiated sensors and an irradiated hybrid.
kb_104 Outer F No C/G Mariane 19/8 KB
kb_105 Outer F No C/G Mariane 19/8 KB

Modules to be installed in the following slots, arranged for tracking studies of the irradiated modules. Two warm-up/cool-down cycles are foreseen, one on Friday to install k5_315 as soon as it is available after assembly and testing, and one on Monday to exchange irradiated barrels to the two which finish annealing on Monday morning (0096* and USA-Q3*). We will do basic threshold scans at several bias voltages on all modules, i.e., we repeat these basic scans several times as modules are exchanged.


   ID Slot    At start:      Friday:      Monday:

   11  -1     kb_104      -> k5_315
    0   0     0026
    1   1     k5_312*
    2   2     0034*
    3   3     0097
    4   4     0007*
    5   5     k5_310*
    6   6     0047*                     -> 0096*
    7   7     k5_303
    8   8     0044*                     -> Q3*
    9   9     k5_308*
   10  10     kb_105


Program

Comments or suggestions to the program are invited. We plan: