SCT Testbeam: Modules to be installed during June 2000 NOTE: All modules should be prepared in suitable boxes with SC99 standard signal and power connections at the latest by the day before installation at H8. Files in the SCT standard formats for detector configuration, mask, trim and response curve should also be ready at this time. Default configuration follows the proposed standard module test settings except that the edge mode should be 1 and the compression mode should be 0 (anyhit). You should also notify the maximum acceptable bias voltage in the case of irradiated detectors. Type Name Chips Origin Responsible Dates B12 K3103 12 KEK Gareth/Nobu 14-28 June B12 KNEXT 12 KEK Nobu 21-28 June B12 RLT5 12 UK Peter P./Lars 14-28 June B12 RLK6 12 UK Peter P./Lars 14-28 June B12 SCAND1 12 Scand. Lars 14-21 June B12* RLT4 12 UK Lars 21-28 June (Fully irradiated module) B12* RLT9 12 UK Lars 21-28 June (Irradiated detectors; unirradiated hybrid) B6* CGH5 6 C/G Gareth/Daniela 21-28 June (Separately irradiated hybrid and detectors) B6* CGH4 3 C/G Gareth/Daniela 14-28 June (Unirradiated detectors; irradiated hybrid) FO12 FR_K81 12 FR Peter K. 14-28 June FO12 FR_K152 12 FR Peter K. 21-28 June Anchor Anchor2 4 Melb. Gareth 14-28 June Anchor Anchor3 4 Melb. Gareth 14-28 June