SCT Testbeam Shifts - June 2000 14-16/6 Installation (NO BEAM due to Septum problem) 17-18/6 Preparatory runs (NO SHIFTS) 19-20/6 Magnet/angle scan (unirradiated modules) 21-22/6 Long MD (NO BEAM): installation of irradiated modules and tests with cooling 22-28/6 Magnet/angle/bias scans with irradiated and unirradiated modules 00-08 08-16 16-24 (Two shifters) (One) (One) Thu 22/6 XXXXXXXXXX ALL: Installation Fri 23/6 GFM AB JCH XW/YL Sat 24/6 MV GL LE AB Sun 25/6 GG ACh JCH ? Mon 26/6 MV GL GFM MV Tue 27/6 AZ GG LE ? Wed 28/6 AM? ACh ALL: De-installation All modules to be removed and chamber parked out of beam by 16:00 Wed 28/6