ATLAS SCT Testbeam3 to 13 September beamtest at CERN H8 |
Fri 12 Sep: Successful integration of the SCT testbeam into the ATLAS Common DAQ.
Wed 16-24 Debugging Thu 00-08 Pixels Thu 08-16 Gareth & Olda Thu 16-24 Mariane Fri 00-08 Peter K & Michael S Fri 08-16 Ana & Sophie Fri 16-24 Thomas & Vladimir Sat 00-08 Jose & Sergio Sat 08-16 Olda & Gaby Sat 16-24 Ana Sun 00-08 Thomas Sun 08-16 Sergio & Jose Sun 16-24 Petr & Vladimir Mon 00-08 Gaby & Olda Mon 08-10 Michael & Vladimir
During the long MD Monday 10:00 to Tuesday 10:00 we will do in-situ calibration and continue preparations for the common DAQ run.
Shifts are not planned initially for the Common Run, Tueday 9/9 to Saturday 13/9, as I expect we will mostly be developing and debugging. However, should we get going, there may be some data-taking through the night at the end of the week. Interested people will be very welcome.
ID | Module | Type | Irradiated ? | Comment |
0 | 20220170200010 | Barrel | No | Reference module; neg. offset S03 |
1 | 20220170200447 | Barrel | Yes: June 2003 | Large Gain Spread module, post-irradiation |
2 | 20220040200018 | Barrel | Yes: June 2003 | Anchor; large oscillation module |
3 | SCAND006 | Barrel | Yes: 2003 | Scandinavian pre-qual |
4 | 20220040200041 | Barrel | Yes: 2003 | NOT WORKING - probably bad cable or support card |
5 | MEL34 | O-EC | No | Melbourne electrical |
6 | K5_312 | O-EC | Yes: 2002 | Previously beamtested irradiated module |
7 | 20220130000002 | O-EC | Yes: 2003 | Geneva pre-qual, post irradiation |
8 | K5_504 | O-EC | Yes: 2002 | Previously beamtested irradiated module |
9 | 20220130000001 | O-EC | No | Geneva pre-qual, unirradiated |
At each bias voltage setting, a full threshold scan: 0.7,0.8,0.9,1.0,1.1,1.2,1.5,2.0,2.5,3.0,3.5,4.0,4.5,5.0,5.5,6.0 fC.
Take double statistics around the nominal operating threshold, 0.9,1.0.1.1 fC.
Program: bias scans at two positions covering as many chips as possible:
Scan ID | # Events per run | Bias settings | Runs |
| | | |
Beam to left-side of modules looking downstream: | |||
A | 20000 | 150/350 | |
B | 20000 | 200/400 | |
Problem of bias of module 7 solved: all 9 modules present now: | |||
C | 20000 | 250/450 | |
D | 20000 | 300/500 | |
E | 20000 | 100/300 | |
Beam to right-side of modules looking downstream: | |||
F | 20000 | 150/350 | |
G | 20000 | 200/400 | |
H | 10000 | 250/450 | |
I | 5000 | 300/500 | Not finished at end of SCT main user period |
J | Not done | 100/300 | |
Common run - new beam trigger (SCT T1 + SCT T2 + Tiles Muon Wall, delay = 95) | |||
K | 5000 | 100/300 | |
L | 5000 | 150/350 | |
M | 10000 | 300/500 |
September 2003 Day Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Date 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 Prepare ***** Install ** *** ** Beam ############# ############ Gareth |---------------------------------------| Gaby <-------------------------------------------> Jose E. Sergio Anna <-------------------------------------------> Bettina <-------------------------------------------> Mariane <-------------------------------------------> Michael |----------------------------| Tomas |----------------------------| Petr |----------------------------| Vladimir |----------------------------|
Charles University, Prague
Peter Kodys
Olda K
University of Geneva
Anna Sfyria
Mariane Mangin-Brinet
Bettina Mikulec
University of Melbourne
Gareth Moorhead 3/9 - 15/9
Gaby Bright
NIKHEF
Thijs Cornelissen 6/9 - 13/9